yurpal.com
E-COMMERCE FOR THE CONSTRUCTION INDUSTRY
[email protected]
833-4YURPAL (498-7725)
Sam Gov #C1BBVLWJPCM7
Invoice Number | YI-071427726 |
Invoice Date | April 26, 2023 |
Total Due | $0.00 |
777 Aviation Blvd Suite #150
El Segundo, CA 90245
WSA Engineering Services
AJW-2W15U
PROJECT # 21-244 - RNO‐ATCT, NV
Delivery Address: Reno-Tahoe International Airport, 755 S Rock Blvd, Reno, NV 89502
Design Details Description:
Two standard steel Baker frames are used to make the two towers. An aluminum Baker platform is used for the main platform, and a custom checker plate aluminum platform is used for the levered section. Because we use standard products, the platform has to be 30" wide x 6’ long, just like our standard Baker product. Engineering certification is included in the price.
Approx weight: 250 lb/structure
Design Duration:
The design duration for this project is 2-3 weeks. This duration can vary and is to be confirmed the moment the order is made. After the design, an approval drawing is sent and shall be signed by the customer before starting the production
Fabrication Duration:
6 - 7 weeks after shop drawing approval.
Transport Information:
LTL FOB - Reno Airport
Hrs/Qty | Service | Rate/Price | Adjust | Sub Total |
---|---|---|---|---|
12 | Aluminum structure 6’ long x 30” wide with cantilevered section 3’ ¼" long x 12’ high total height, as per drawing sent by customer. Final dimensions will be indicated on technical drawings which will be prepared once the quote has been approved. |
$0.00 | 0.00% | $0.00 |
8 | Detail, fabricate, hot dip galvanize, and deliver 8 pcs Fall Arrest Tie Off Brackets including ½” A325 bolts per dwg RNO ATCT RPB SK-1 |
$0.00 | 0.00% | $0.00 |
1 | Shipping & Handling | $0.00 | 0.00% | $0.00 |
Sub Total | $0.00 |
Tax | $0.00 |
Total Due | $0.00 |