Quote

From:

yurpal.com
E-COMMERCE FOR THE CONSTRUCTION INDUSTRY

555 Anton Blvd.
Costa Mesa, CA 92626

[email protected]
833-4YURPAL (498-7725)

Quote Number YQ-7567
Quote Date March 2, 2023
Total $9400.00
To:
Sentinel Power
Hrs/Qty Service Rate/PriceAdjustSub Total
1

Scope of work:

• Scope of work begins by infilling an existing Exhaust hole in the existing wall.

• Tooth in new CMU by saw cutting the existing CMU out.

• New CMU will be 8” thick similar to existing

• Don’t exclude paint.

• Sawcut into the existing wall for new Exhaust hood installation(by others.)

• Install a new 4 foot lentil(provided by GC)

• Tooth in new opening by saw cutting existing CMU blocks.

• Include prevailing wage assumptions

$9400.000.00%$9400.00
Sub Total $9400.00
Tax $0.00
Total $9400.00

Add a comment

Your email address will not be published. Required fields are marked *